Contact Us
TEL: 86-400-108-0855
Fax: 86-519-83272808
E-mail: sales@suntop-cn.com
Address: No.56 Hehuan Road, Zhong Lou Development Area, Changzhou, China

Urban Traffic Intelligent Lane Change Fence

Road robots - tidal lane solutions Project overview Objectives of the project: At present, the traffic density of the road traffic is different, causing the traffic jam in the local section. Meanwhile, road surface resources have not been fully utilized. Through intelligent transformation, under...

Road Robot

No.

Function

Road Robot

GG Zipper

Conclusion

1

Single Lane change   duration

 

35 seconds

 

35 minutes

Road Robot’s efficiency is 60 times of Zipper’s, the longer the road   the more advantage Road Robot’s efficiency shows

 

2

Multi-Lanes change

1-N lanes   change

 

Only single lane change possible

 

Road Robot holds the   freedom of multi-lane changes

3

Operation

Operated by Automatic system

 

Operated by humans   trained specifically for this purpose

 

Road Robot is operated by   Automatic system

4

Adaptation to curves

 

High,   complete coverage

Low,   limited road circumstance application

 

Road robot covers all   curved road in the city, adapting curves 100%

 

5

Smart Traffic Information   Share System

Smart data connection can   connect to internet and cellular data

 

Operated manually, no internet or data   connection

 

Road Robot can function   individually or connect with Smart City’s database and internet

6

Program Investment

Similar

Similar

 

Similar Investment

 

7

Operational Cost

 

$36 per year/ per KM

 

$50,000 per year/ per KM   (excluding cost of plastic mould)

 

GG Zipper’s operational cost (labor + vehicle + gas)   overwhelms Road robot’s cost at 400 times. Road robot   consumes electricity at 0.5 W /day/time/KM

 

Road robots - tidal lane solutions

Project overview

Objectives of the project:

At present, the traffic density of the road traffic is different, causing the traffic jam in the local section. Meanwhile, road surface resources have not been fully utilized. Through intelligent transformation, under the condition of existing roads, by robots with different directions in different time intervals, the road traffic peak, lane also transform driving direction, redistribution of resources of in and out of the flow path, and meet the needs of the particular region wave trough travel flow. Avoid duplication of investment caused by environmental pollution, resource waste, make urban transformation, the path of the economical, on the premise of keep the city street view are not destroyed, enhance the capacity of the road pavement intercepting, promote the city's comprehensive management level, to improve the quality of public service work, achieve the purpose of the citizen satisfaction.

System composition of the project

1. Road robot host

2. Robot telescopic rod (quantity according to actual length of site, according to 3M/branch * 2 pieces/set)

3. Control cabinet

4. Electric cabinet mounting column

Installation of the project

Method 1: have the central green belt municipal power supply mode

Method 2: no central green belt municipal power supply mode

Mode 3: installation of gantry frame


The way the road robot is installed:

Method 1: have the central green belt municipal power supply mode

image001.jpg

Method 2: no central green belt municipal power supply mode

image003.jpg

Mode 3: installation of gantry frame

 image005.jpg

The operation of the road robot

1. The on-duty personnel went to the scene to open the cabinet.

2. Pull out power cord,

3. Insert the road robot.

4. Return the power to the cabinet,

5. Push the remote control and start walking. (change 1 lane about 35 seconds)

6. The guardrail moves to the designated position and then the remote control stops operation.

7. Turn off the power,

Remove the power cord from the road robot.

9. Take back the power cord and turn off the electric cabinet. (the whole work was completed, about 2 minutes.)

 

Design style

Style 1: red and white engineering grade reflective film spacing is attached to the rail link to increase the night warning effect

image007.jpg

image009.jpg

Style2:Pure color

image011.jpg

image013.jpg

Style 3: yellow and black engineering grade reflective film spacing is attached to the rail link to increase the night warning effect.

 image015.jpg


image017.jpg




Inquiry